Another step closer towards the completion  of the XP-82 TWIN MUSTANG #44-83887.Since January 2013 Tom and Weezie have been installing systems in the center section and both fuselages at a rapid pace.They started sub-assembling all the systems about 18 months ago, i.e., gear and retract mechanisms, electrical, quadrants, control and trim cables, trim boxes, hydraulic components and lines, stick/pedal assemblies, flap, and coolant tube systems; and then sealing them in boxes awaiting installation(s). The shelves are getting emptier and emptier every day.

Wings

The entire team–Paul, Randall, Ayman, Jeremy and Tim–have been steadily working on the two outboard wings attached to the center section prior to their going onto the steel fixture. The preliminary drill-up of the skins with #40 drill holes (tiny) on the right-hand wing is now completed. All of the fuel bay hat channels and stringers in the left-hand wing are nearing completion. By the end of January, Tom projects that both wings will be in the steel fixture for final sweep, dihedral and wash-out alignment (check the May newsletter for descriptions) and final drill-up to size and final riveting.

Right Hand Wing
Right Hand Wing

Control Systems

The final fitting of all the control cables and pulleys in both fuselages and center section is now completed back to the tail assembly factory breaks in the aft fuselages. The team is still waiting for three parts from the machine shop to complete the installation of the rudder pedal assemblies in the right-hand fuselage. We are now just completing the canopy opening/closing and jettison systems. As mentioned last month regarding the canopy trucks, one of the six failed NDI (non destructive inspection) due to cracks so small that one cannot see them even using a magnifying glass. One of the contract machine shops hired by Tom is now machining a replacement.

Insulated Coolant Tubes
Insulated Coolant Tubes

Coolant Systems & Tubes

All of the multi-layer coolant tube insulation was delivered the second week of December. A beautiful job matching the original color, texture and stitch patterns. They  just completed installing all of the insulated 2” and 1.25” tubes from the firewall(s) back to just forward of where the radiators mount.

  Floorboard Molds

In order to make the compound shape floorboard molds, Tom had to epoxy-glued salvageable parts from each damaged floorboard together to make a complete pair of left- and right-hand floorboards to serve as molds to be used to make four new panels. It is expected to have these two molds completed some time this coming January.

Floorboards

As critical as they have been to match everything back to as original on this XP-82 restoration–paint colors, 442 rivets, #1 cad plate, etc., etc., the team had to make a modification to the original phenolic floorboards. They have a number of original phenolic floorboards, and every one of them has fracture-failure repairs made when this aircraft was in service.

Phenolic is a laminated cotton, somewhat like fiberglass, but no where near as strong. They all had failed where the pilots had to stand on the floor panels when entering and exiting the cockpits. Tom had to come up with a non original idea, (Pat Harker actually did this mod to his F-82E), to make the floorboards out of carbon fiber with a layer of the correct color and weave cotton laminated on the exterior top and bottom of each surface giving the appearance that each panel is still phenolic. With the carbon fiber laminated in between the two exterior cotton layers, the finished floorboards will look identical to the original, but will be many times as strong.

The molds used to reproduce the original floorboards.
The molds used to reproduce the original floorboards.

Heat Exchangers (Oil Coolers)/Miscellaneous Parts

Martin Radiator has started on the two heat exchangers,the last needed wing jack point was delivered and is now installed.Tom is waiting the last two of five flap control arms to be delivered in January. When they arrive, the team can complete the center section to outboard wing flap tube structure and install them on the aft center section spar located under each fuselage.

This article is based on the XP-82 Restoration Project December Newsletter  and it was reproduced with the permission of Tom Reilly. Visit the XP-82 Restoration Project’s website for more information.

2 Comments

Graphic Design, Branding and Aviation Art

Leave a Reply

Your email address will not be published.


*